Daily Scrum Mistakes.

After researching techniques that would improve my Daily Scrum.  I thought I would highlight some mistakes that can occur within a Daily Scrum Meeting that you can further improve to make your Daily Scrum more appealing.

I read an article on “Scrum from the Trenches” Daily Scrum Mistakes  that echo’s some of the sentiments felt by myself.

The first mistake that people often make are to over run the allocated 15 minutes.  This can cause people to lose focus on what the Daily Scrum meeting is truly about.

The second mistake that people make, and I myself allow this to happen on occasion, is that Team members are effectively Reporting Status to the Scrum master.  Many people look at the Scrum Master whilst giving their status rather than giving a status report to the whole team.  I try to not make eye contact with the person speaking as to avoid it being a status update aimed at myself, rather than to the whole team.  The Scrum Master is part of the team and holds no managerial authority, so therefore a status update should be aimed at the whole team and not just the Scrum master in general. 

Leading back to my first point about the allocated 15 minutes. Remember the Daily Scrum is a status meeting.  It is very easy for a Daily Scrum to become a design meeting when one person is describing difficulties that they are having.  The Scrum Master has to be aware of this and limit technical and design discussions.  encourage Team Members to take their discussions “offline” and discuss the possible solutions after the Daily Scrum. 

The best possible way to conduct the Daily Scrum is to have the attendees standing up.  If the Team are sitting down, they become more formalized and meetings tend to run over.  If the Team are standing the meeting becomes more efficient due to people wanting to have the meeting done and dusted quickly so that they can sit down again! 

One problem that I had in the past with my team was that we were always being drawn into design and technical meetings in our Daily Scrum.  The Scrum Master must be firm on this.  I see myself as a nice guy, but at the beginning I was too nice for my own good.  I was worried that continually interrupting these meetings, would see me as being labeled rude.  But I soon realised that the team were labeling the meetings as laborious as they continually over ran.  So therefore I had to step in and limit the design and technical discussions until after the meeting.

we now have a designated time where we allow converse with interested parties after the Scrum meeting where Team Members can gain clarification on requirements of discuss problems with other team members.  I would say that this has improved our efficiency overall as the Daily Scrum is useful again and not laborious.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s